Why approval is required
In a sectional title scheme the outside face of the building, the roof, the common risers and often the balcony soffits are common property. Mounting a condenser on a wall, running pipework through a riser or adding a duct to a facade is an alteration to common property, which means the scheme has to agree.
Architectural guidelines in security estates usually go further, covering colour, screening, pipe covers and where equipment may be seen from the street.
What a complete submission contains
A marked-up photograph or elevation showing the exact position, the unit specification including its sound rating, a description of the pipe route and drain discharge point, the fixing method, and a note on who will service it.
We prepare this information as part of a survey, so the owner is not left assembling it from a quotation. Where a scheme specifies screening or a paint finish, we build it into the specification rather than discovering it on site.
Sequencing that avoids wasted money
The most common costly mistake is ordering equipment and booking installation before approval is granted. If the committee asks for a different position, pipe lengths, bracket type and sometimes the unit itself change.
Survey first, submit, then schedule. It is slower on paper and considerably faster in practice.